This site uses cookies to optimize your browsing experience and track how you interact with it. By clicking on “I accept”, you consent to the use of these cookies. For more details on how we process this information, see our privacy policy.
The closure of the Saint-Laurent overpass above Route 136, scheduled for the night from Saturday to Sunday, has been postponed to a later date. Route 136 (Ville-Marie and Viger Tunnels) • Full closure westbound : between Rue Panet and the......
Read more
The project implies completely rebuilding the north platform. In spite of this, the station will remain open and trains will circulate as usual. Nature of the work Demolition of the north platform Debris removal Concrete pouring Reconstructi......
Read more
Residences will remain accessible at all times, although some parking spaces may be temporarily occupied by equipment. Alternate routes will be provided for cyclists. Please be sure to follow posted signage for any changes. Work Schedule: Work wi......
Read more
The project consists of repairing and rebuilding a water main. It will also integrate Westmount Public Works operations. A secondary sewer will be repaired, water connections will be replaced, and utilities and roads will be rebuilt. The approximat......
Read more
Night work is planned: Night of September 15 to 16 , between Sainte-Catherine Street and Dorchester Boulevard Night of September 20 to 21 , between Saint-Antoine Street and Prospect Street In addition to these night interventions, stree......
Read more
Night work is scheduled between September 20 and 22 on Greene Avenue, between Saint-Antoine Street and Prospect Street. During this period, Greene Avenue will be completely closed to vehicular traffic between Saint-Antoine and Prospect, includi......
Read more
Traffic disruptions are expected in the area between De Courcelle and Lenoir streets , including partial and full closures at various stages of the project. Traffic impacts On Saint-Antoine Street, between De Courcelle and Lacasse street......
Read more
Main traffic disruptions Route 136 eastbound : full closure between Exit 4 (Victoria Bridge, Robert-Bourassa Boulevard, de la Montagne Street) and the entrance from Atateken Street, from Friday 11 p.m. to Monday 5 a.m. Closure of access ramps to......
Read more
This closure is required to allow for the installation of the steel structure for the western section of the Saint-Urbain Street overpass as part of the bridge rehabilitation project. Closure Details and Detours Westbound Complete closure of Hig......
Read more
This work is intended to maintain the reliability of the water distribution system and ensure the safety and integrity of municipal infrastructure in the area. Traffic disruptions are expected, including the closure of east-side lanes on Atwater Av......
Read more
The following directional changes will take effect as of Saturday, August 15: Argyle Ave. (from Thornhill Ave. to Côte-Saint-Antoine Rd.): One-way going south Kensington Ave. (from Côte-Saint-Antoine Rd. to Sherbrooke St. W.): One......
Read more
What is a yield street? A yield street is a traffic-calming configuration designed for narrow two-way roads where space does not comfortably allow two cars to pass side by side. Instead of widening the road, one direction of travel is assigned prio......
Read more
Want to take part in the collective effort? Here are a few free activities happening near Westmount: Monday, October 20 Visit of a composting facility —9 a.m. to 1 p.m.—Departure from the Westmount Recreation Centre Panel “J’en ai as......
Read more
Notice to residents: Please move any vehicles that are parked on the street to leave more space between your vehicle and the sidewalk. This will allow snowplows to clear the sidewalks effectively. Overview Heavier than expected snowfall occurred......
Read more
Reminder: Vehicles must be winter-ready from December 1 to March 15. Learn more Overview A new layer of snow fell from November 16 to 17. Our teams are on the ground clearing snow and ensuring public safety on our territory. Current Operation......
Read more
Update - Dec. 12, 2025 at 5 p.m.: Snow loading operations will start on Saturday, December 13 at 6 a.m. Consult Info-NEIGE Westmount app to view planned operations and parking restrictions. Over the past 24 hours, approximately 10 cm of snow has......
Read more
Update—January 29, 2026, at 2 p.m.: Following a pause to operations due to unforeseen circumstances on January 29, snow loading operations are planned to resume on January 30. From the evening of January 25 to the afternoon of January 26, approxi......
Read more
The City is undertaking its 7 th snow removal operation of the season. This follows an accumulation of approximately 13 cm of snow across the territory of the City of Westmount from February 10 to 12. The City's Public Works teams continue......
Read more
The City is undertaking its 8 th snow removal operation of the season. P recipitation overnight on February 25, combined with the previous week's snowfall and snow from private parking spaces, has resulted in snow accumulation of up to 15 cm in s......
Read more
Recyclable materials are materials that can be reintroduced into the production process from which they are derived or into a similar process that uses the same type of material. Recovery is the process of sorting materials at home and having th......
Read more
Parking pay stations in Westmount feature pay-by-plate technology, allowing users to pay for on-street parking based on the licence plate number rather than on the parking spot. Users may move their vehicle without having to pay again within the sa......
Read moreMoving: Residential A permit is not required to temporarily occupy the public domain during a residential move. In addition, temporary signage may be installed by the Public Works Department to ensure parking space for a moving truck. This service......
Read moreWestmount residents who do not have sufficient parking space on their property, including anyone living in an apartment, condo or similar dwelling, may apply for permission to park on the street. Red 'G' permit Red “G” permit allows the......
Read moreIf your vehicle is towed during snow removal or street cleaning operations, please contact Public Safety at 514 989-5222 . Snow Removal Advance warning of snow removal and the times at which it will be taking place are given by flashin......
Read moreThis section outlines the key elements used in the study and evaluation of various issues related to traffic management within the City: Request and/or nature of file Criteria and warrants used for evaluation Additional parameters to consider......
Read more