This site uses cookies to optimize your browsing experience and track how you interact with it. By clicking on “I accept”, you consent to the use of these cookies. For more details on how we process this information, see our privacy policy.
Distribution of Reminder Cards An electoral notice, also called a reminder card, was distributed to every address within the City’s territory. This document contains the following information: The names of the voters registered at that address......
Read more
From May 26 to 30 , paving work will be carried out on the bike path between Melville Avenue and Wood Avenue . From June 2 to 5 , paving work will be carried out on the cycle path between Prince Albert Avenue and Lansdowne Avenue. Access a......
Read more
For drivers, here is the suggested route: Travel along Dorchester Boulevard heading toward René-Lévesque Boulevard West; Turn onto Greene Avenue (downhill); Parking at Centre Greene remains accessible; or It will only be possible to drop of......
Read more
Election Day: Sunday, November 2, 2025, from 10 a.m. to 8 p.m. Four voting locations will be open across the city, with more staff on-site to make your visit easier: Districts 1 and 2 : The Study School–1 Braeside Place ➤ If arriving by car,......
Read more
Collection vehicles, identified by the Agency's logo and the words ‘ Étude de mobilité ,’ will be circulating on city streets during the month of October 2025 . These vehicles will not issue tickets, as their sole purpose is to collect data. To ana......
Read more
Traffic Disruption Details From Friday, May 9 at 11:59 p.m. until Monday, May 12 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Traffic Disruption Details From Friday, May 16 at 11:59 p.m. until Tuesday, May 20 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance......
Read more
Traffic Disruption Details From Friday, May 23 at 11:59 p.m. until Monday, May 26 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Access and Mobility One lane will remain open on De Maisonneuve Boulevard during the work. Access to perpendicular streets will be limited to local traffic, and residences will remain accessible at all times. Please note that no parking wi......
Read more
Traffic Disruption Details From Friday, May 30 at 11:59 p.m. until Monday, June 2 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Closure and detour details Westbound : between Panet Street and the entrance from Lucien‑L’Allier Street Traffic will be detoured via Avenue Viger and Saint‑Antoine Street West Eastbound : between exit no. 4 (Victoria Bridge, boulevard R.-Bo......
Read more
On April 1, 2024, Lucien-L’Allier station had to be closed due to some major renovation work. The work consists mainly in rebuilding the four platforms, which are at the end of their useful life, and in bringing the site up to accessibility and safe......
Read more
Want to quickly check the snow removal status of your street or find out when you need to move your vehicle? Info-Neige provides all this information, making it easier to get around and plan your winter activities. How It Works and Key Features......
Read moreStay informed with the latest news, updates, and announcements from the City of Westmount.
Read more
The City of Westmount has released the final report by the firm Atkins Réalis (formerly SNC-Lavalin), dated July 7, 2025, on noise levels generated by Route 136 within its territory as part of the Turcot Interchange project. Commissioned jointly by......
Read more
On December 6, 1989, 14 young women were murdered at the École Polytechnique in Montreal. Each year, commemorative activities marking this tragic event highlight the need to continue efforts to end all forms of gender-based violence. Women, girls a......
Read more
4:15 p.m. update Crews are fully mobilized on site to repair the gas leak and restore electricity to the Alexis Nihon and Westmount Square area. Due to the highly complex nature of the incident and the delicate interventions required, the opera......
Read moreThe Commission de la sécurité publique invites Montrealers to attend a public meeting, during which the Service de police de la Ville de Montréal (SPVM) along with the Centre d’aide aux victimes d’actes criminels de Montréal will present on accompan......
Read moreRoad closures and trafic management Turcot interchange Closure of the Turcot interchange ramp leading from Highway 20, eastbound, to Route 136, eastbound, from Friday 11:59 p.m. to Monday 5 a.m . Closure of the Turcot interchange ramp le......
Read more
This closure is necessary for the relocation of public utility lines as part of the reconstruction of the Saint-Urbain overpass above Highway 136. These works are part of the major refurbishment project for the Ville-Marie and Viger tunn......
Read more
The closure of the Saint-Laurent overpass above Route 136, scheduled for the night from Saturday to Sunday, has been postponed to a later date. Route 136 (Ville-Marie and Viger Tunnels) • Full closure westbound : between Rue Panet and the......
Read more
Route 136 will be completely closed westbound, between Boulevard Robert-Bourassa and the entrance from Rue du Fort, over the weekend of April 11. This closure is required to repair overhead structures on Route 136. Read the press release fro......
Read more
The City's new website will be launched on Wednesday, April 23. The primary objective of this project was to significantly improve information dissemination, ensuring that municipal information is easier to find and understand. This was achieved thr......
Read more
Residences will remain accessible at all times, although some parking spaces may be temporarily occupied by equipment. Alternate routes will be provided for cyclists. Please be sure to follow posted signage for any changes. Work Schedule: Work wi......
Read more
The project consists of repairing and rebuilding a water main. It will also integrate Westmount Public Works operations. A secondary sewer will be repaired, water connections will be replaced, and utilities and roads will be rebuilt. The approximat......
Read more