This site uses cookies to optimize your browsing experience and track how you interact with it. By clicking on “I accept”, you consent to the use of these cookies. For more details on how we process this information, see our privacy policy.
Main traffic disruptions Route 136 eastbound : full closure between Exit 4 (Victoria Bridge, Robert-Bourassa Boulevard, de la Montagne Street) and the entrance from Atateken Street, from Friday 11 p.m. to Monday 5 a.m. Closure of access ramps to......
Read moreRoad closures and trafic management Turcot interchange Closure of the Turcot interchange ramp leading from Highway 20, eastbound, to Route 136, eastbound, from Friday 11:59 p.m. to Monday 5 a.m . Closure of the Turcot interchange ramp le......
Read more
Traffic Disruption Details From Friday, May 9 at 11:59 p.m. until Monday, May 12 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Traffic Disruption Details From Friday, May 16 at 11:59 p.m. until Tuesday, May 20 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance......
Read more
Traffic Disruption Details From Friday, May 23 at 11:59 p.m. until Monday, May 26 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Traffic Disruption Details From Friday, May 30 at 11:59 p.m. until Monday, June 2 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Closure and detour details Westbound : between Panet Street and the entrance from Lucien‑L’Allier Street Traffic will be detoured via Avenue Viger and Saint‑Antoine Street West Eastbound : between exit no. 4 (Victoria Bridge, boulevard R.-Bo......
Read more
On April 1, 2024, Lucien-L’Allier station had to be closed due to some major renovation work. The work consists mainly in rebuilding the four platforms, which are at the end of their useful life, and in bringing the site up to accessibility and safe......
Read more
A classification certificate issued by the Corporation de l’Industrie Touristique du Québec (CITQ) is required. Click here to learn more about how to register your principal residence as a tourist accommodation . If you know of a person or busines......
Read moreThis decision, made public by the Minister of Municipal Affairs, aims to provide homeowners with additional time and to allow for the development of solutions that better reflect on-the-ground realities. No penalties will be enforced before&nb......
Read moreThe City of Westmount has released the final report by the firm Atkins Réalis (formerly SNC-Lavalin), dated July 7, 2025, on noise levels generated by Route 136 within its territory as part of the Turcot Interchange project. Commissioned jointly by......
Read more
On May 3, 2024, the City Treasurer signed the 2023 operating results financial report and the audited financial statements, which will be submitted to the Ministère des Affaires municipales et de l’Habitation (MAMH).
Read moreThe stability of the electrical service is threatened by peak consumption. Without an immediate reduction in overall demand, the risk of service interruptions and sector-wide outages is very high. To protect the grid and maintain service, please fo......
Read more
It was with great sadness that we learned of the passing of Marc Garneau on June 4, 2025. As a sign of mourning and respect, the flags at the City of Westmount’s building will be flown at half-mast to pay homage to a man whose remarkable journey lef......
Read more
Invasive plants are non-native trees, shrubs, grasses and flowers that have been spread by human activity, intentionally or accidentally. They are often capable of reproducing and spreading rapidly, outcompeting native species and upsetting the ecos......
Read more
The rehabilitation and reconstruction of valve chambers on Rue Sherbrooke and Avenue Wood will begin on February 5 and are expected to last for approximately 13 weeks . Work will take place Monday to Friday, from 7:00 a.m. to 6:00 p.m . These esse......
Read more
This closure is necessary for the relocation of public utility lines as part of the reconstruction of the Saint-Urbain overpass above Highway 136. These works are part of the major refurbishment project for the Ville-Marie and Viger tunn......
Read more
The closure of the Saint-Laurent overpass above Route 136, scheduled for the night from Saturday to Sunday, has been postponed to a later date. Route 136 (Ville-Marie and Viger Tunnels) • Full closure westbound : between Rue Panet and the......
Read more
The work aims to improve the infrastructure, including the reconstruction of the street, and the replacement of the water, sewer, gas, and electrical networks. Details of the Work Area affected : Rue Saint-Antoine, between Avenue Atwater and R......
Read more
The project implies completely rebuilding the north platform. In spite of this, the station will remain open and trains will circulate as usual. Nature of the work Demolition of the north platform Debris removal Concrete pouring Reconstructi......
Read more
Route 136 will be completely closed westbound, between Boulevard Robert-Bourassa and the entrance from Rue du Fort, over the weekend of April 11. This closure is required to repair overhead structures on Route 136. Read the press release fro......
Read more
The project is scheduled to start on May 20 and last an estimated 13 weeks. The work will be carried out in phases to minimize the impact on traffic, businesses, and residents . During the work, pedestrian access to homes and businesses will be ma......
Read more
Residences will remain accessible at all times, although some parking spaces may be temporarily occupied by equipment. Alternate routes will be provided for cyclists. Please be sure to follow posted signage for any changes. Work Schedule: Work wi......
Read more
The project consists of repairing and rebuilding a water main. It will also integrate Westmount Public Works operations. A secondary sewer will be repaired, water connections will be replaced, and utilities and roads will be rebuilt. The approximat......
Read more
As part of the major work being carried out by exo to improve accessibility at Vendôme station, two concrete pouring operations will take place: Saturday, July 12 , from 7 a.m. to 4 p.m. Saturday, July 19 , from 7 a.m. to 4 p.m. This work......
Read more