This site uses cookies to optimize your browsing experience and track how you interact with it. By clicking on “I accept”, you consent to the use of these cookies. For more details on how we process this information, see our privacy policy.
Collection vehicles, identified by the Agency's logo and the words ‘ Étude de mobilité ,’ will be circulating on city streets during the month of October 2025 . These vehicles will not issue tickets, as their sole purpose is to collect data. To ana......
Read more
Traffic Disruption Details From Friday, May 9 at 11:59 p.m. until Monday, May 12 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Traffic Disruption Details From Friday, May 16 at 11:59 p.m. until Tuesday, May 20 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance......
Read more
Traffic Disruption Details From Friday, May 23 at 11:59 p.m. until Monday, May 26 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
Access and Mobility One lane will remain open on De Maisonneuve Boulevard during the work. Access to perpendicular streets will be limited to local traffic, and residences will remain accessible at all times. Please note that no parking wi......
Read more
Traffic Disruption Details From Friday, May 30 at 11:59 p.m. until Monday, June 2 at 5:00 a.m. Complete closure of Route 136 West between Exit 5 (A-10 / R-112 / R.-Bourassa Blvd / Champlain and Victoria Bridges) and the Fort Street entrance.......
Read more
The project consists of repairing and rebuilding a water main. It will also integrate Westmount Public Works operations. A secondary sewer will be repaired, water connections will be replaced, and utilities and roads will be rebuilt. The approximat......
Read more
Closure and detour details Westbound : between Panet Street and the entrance from Lucien‑L’Allier Street Traffic will be detoured via Avenue Viger and Saint‑Antoine Street West Eastbound : between exit no. 4 (Victoria Bridge, boulevard R.-Bo......
Read more
A mobile crack-filling truck will travel through different areas of the City over the two-day period to carry out this road maintenance work. As the work will be carried out by a mobile crew, the truck will move from one street block to another thro......
Read more
On April 1, 2024, Lucien-L’Allier station had to be closed due to some major renovation work. The work consists mainly in rebuilding the four platforms, which are at the end of their useful life, and in bringing the site up to accessibility and safe......
Read more
Important: Changes have been made to collection days in certain sectors. View the collections map Search by address Accepted materials Residues in paper bags or open containers weighing no more than 50 lbs (2......
Read more
Throughout the summer, the Green Patrol team will promote eco-responsibility through various activities. By inspecting materials put out for waste collection and by going door-to-door, they’ll encourage residents to sort properly sort and reduce lan......
Read more
Through daily inspections, door-to-door outreach, and information kiosks, they will encourage residents to adopt eco-friendly habits. The upcoming kiosks, weather permitting, are as follows: Friday , June 20 , between 1 and 4 p.m. at Westmount P......
Read more
The survey, which was conducted among residents of single-family homes and buildings with eight units or less, took place from March 30 to April 30, 2026. Waste ambassadors from Enuf (a B Corp-certified company) assisted with collecting survey res......
Read more
Due to the ongoing strike at Canada Post, the Office of the Chief Electoral Officer will implement all necessary measures to ensure that voters receive their notice of entry on the electoral list. This notice, which will be sent to all addresses wit......
Read more
Want to quickly check the snow removal status of your street or find out when you need to move your vehicle? Info-Neige provides all this information, making it easier to get around and plan your winter activities. How It Works and Key Features......
Read more
Bulky items collection aims to divert large household items made of wood, ceramic and refrigeration appliances from landfill, so that they can be recycled and recuperated. Don't miss the collection! Bulky items are collected on the first......
Read moreNatural gas is odourless. A very smelly substance is added so leaks can be detected. This substance, called mercaptan, gives off a strong smell of rotten eggs. If you detect such an odor: do not smoke; do not turn on any appliance near the leak,......
Read moreThe City offers its residents door-to-door collections of garbage, recycling, food waste (compost), garden waste and bulky items. Recycling and food waste bins are provided for free. Visit the Waste Collection page
Read moreConsult by-law 1575 to establish a Planning Advisory Committee Role The Planning Advisory Committee (PAC) of the City of Westmount, given its exceptional built and landscape heritage, plays a significant role in its preservation and enhancement......
Read more
4626 Sherbrooke Street West, H3Z 1G1 (at Lansdowne) Telephone : 514 989-5226 It would be unthinkable to talk about Westmount’s municipal buildings without mentioning Victoria Hall, the City’s community center. This avant-garde structure is......
Read more
Door-to-door transportation for people with long-term disabilities. Information Telephone : 514 280-8211 Website
Read more
Citizen Portal Opt-in to snow removal notifications via the Citizen Portal and be notified by SMS or email of current snow clearing operations. How to Sign Up Create your account in the Citizen Portal From your account, select My Municipa......
Read moreInspection Report At the start of the vacancy, and every five years thereafter , the person in charge of the premises must submit a comprehensive inspection report on the building. This report must cover, in particular: roofs; facades;......
Read moreProject Summary Work to be completed: Reconstruction of the Thornhill staircase Construction area: The pedestrian staircase connecting Stanton Street and Thornhill Street Start date: Week of August 10, 2026 Estimated duration: until su......
Read more