This site uses cookies to optimize your browsing experience and track how you interact with it. By clicking on “I accept”, you consent to the use of these cookies. For more details on how we process this information, see our privacy policy.
Required documents for a preliminary review : A letter describing the scope of the proposed work; A letter from the building owner authorizing the permit application, if the request is made by a third party; A copy of a recent certificate of......
Read more
For its 2026 production of Shakespeare-in-the-Park, Repercussion Theatre presents an Afrofuturistic take on The Winter’s Tale , modeling bravery, boldness, and grace in the face of tyranny, as the hopeful rebellion of young lovers upends the bloody......
Read more
For its 2026 production of Shakespeare-in-the-Park, Repercussion Theatre presents an Afrofuturistic take on The Winter’s Tale , modeling bravery, boldness, and grace in the face of tyranny, as the hopeful rebellion of young lovers upends the bloody......
Read more
For its 2026 production of Shakespeare-in-the-Park, Repercussion Theatre presents an Afrofuturistic take on The Winter’s Tale , modeling bravery, boldness, and grace in the face of tyranny, as the hopeful rebellion of young lovers upends the bloody......
Read more
For its 2026 production of Shakespeare-in-the-Park, Repercussion Theatre presents an Afrofuturistic take on The Winter’s Tale , modeling bravery, boldness, and grace in the face of tyranny, as the hopeful rebellion of young lovers upends the bloody......
Read more
The public is invited to discover the preferred design model developed following the various participatory activities and studies carried out by the consulting engineering firm as part of the project to reconstruct Avenue Claremont. Public Informa......
Read more
The public participation process for this project included an information session where the public was invited to discover the preferred design model (January 2025), and public consultations to present the project as well as preliminary designs (May......
Read more
Commissioner of Legal affairs and Communications Commissioner for Parks and Green Spaces 514-989-5200 ext. 5079 maronson@westmount.org Biography Matthew E. (“Matt”) Aronson lives at the heart of the community he represents with his p......
Read more
This park was built in 1927 and expanded in 1938. The comfort station was constructed in 1940. Its rectangular shape echoes the street pattern of the sector. An outdoor skating rink is maintained during the winter, and an accessible splash pad in th......
Read moreRequired Documents Documents indicated by an asterisk (*) are required. *A letter describing the scope of the proposed work *A letter from the building owner authorizing the application, if the request is made by a third party *A letter from th......
Read moreIn 1895 the Town of Cote St. Antoine changed its name to become the Town of Westmount. During the period from 1895 to 1908 when the Town got its charter and became the City of Westmount, the area saw its greatest period of growth. Ambitious civic pr......
Read moreIn the heart of Westmount lies Quebec’s oldest municipal library, built in 1899. One of the first library buildings in Canada, the Westmount Public Library is cherished for its heritage value. While it has been expanded and changed over the years,......
Read moreDid you know that the monarch butterfly population has dropped by more than 90 percent in the last 20 years? Along with deforestation and pesticide use, one of the main causes of this decline is the drastic reduction of the asclepias plant, common......
Read more
Why use Antoine? Accessible from the chat icon at the bottom right of every page, Antoine offers a simpler way to navigate municipal information and services: Available 24/7 : Get answers anytime, even outside office hours. Faster access to in......
Read more