Required Documents Documents indicated by an asterisk (*) are required. *A letter describing the scope of the proposed work *A letter from the building owner authorizing the permit application, if the request is made by a third party *A letter......
Read moreProject Summary Work planned : Replacement of the main staircase foundations at Victoria Hall Work area : Victoria Hall main entrance (Arlington Avenue) Start date : Week of May 25, 2026 Estimated duration: Until the end of August 2026......
Read moreThis ongoing work involves carrying out targeted repairs to potholes that present a significant safety risk. These repairs are temporary by nature. At present, no available technology can guarantee the long‑term durability of pothole repairs carri......
Read moreThese works consist of localized repairs of small areas of asphalt that have deteriorated significantly or where recurring potholes pose create safety concerns. The work involves removing and replacing the top layer of asphalt only. This type of in......