Please take note that the resurfacer lifting operation will require the closure of Lansdowne Avenue between Ste-Catherine and De Maisonneuve on Friday, November 13, 2020 (note that the bike path on De Maisonneuve will remain accessible) :
- Location: 4675 Ste-Catherine Street West (lift on Lansdowne Avenue, closure between Ste-Catherine and De Maisonneuve)
- Date of work: November 13, 2020 starting at 7 a.m.
- Duration: 1 day (8 a.m. to 12 p.m.)
- Contractor: Grues Maurice Gendron Ltée/Zamboni Robert Boileau Inc./Public Works (buildings)
- Job Description: Lifting and handling with a crane to replace the two ice resurfacers in the WRC skating rinks with two new resurfacers. Note that 3 flagmen will be present during the operation to ensure a security perimeter on the roof (green spaces) and to ensure local traffic for Lansdowne Avenue residents on each side.